 |
Portable
& reusable equipment for loads of
up to 40ft in length. |
 |
Ideal
for ground stuffing long heavy loads. |
 |
No
requirement for specialist top or side
loading containers. |
 |
Use
unmodified 20' & 40' ISO end loading
containers. |
 |
Any
loads up to 40' long placeable on the
loading plinth can be selfloaded into
the container. |
 |
Rapid
turn around time - typically 30 minutes. |
 |
Equipment
is removed after loading/unloading. |
 |
To
strip the container reverse the system
at the unloading destination and pull
out the load. |
 |
The
system comprises of the Joloda Container
Jacking System, 40' (12m) skates running
in captive track down a sloped plinth
into the container. |
 |
Utilise
standard ISO boxes and save $ 000's! |